Legal Requirements

Why Asbestos Must Be Cleared Before Demolition Begins

Under the Control of Asbestos Regulations 2012, a refurbishment and demolition survey must be carried out before any demolition or significant structural alteration work begins. All identified ACMs must be safely removed before demolition commences. Attempting demolition without prior asbestos clearance is both illegal and extremely dangerous — placing every person on site at serious risk of fibre exposure.

  • Pre-demolition survey included as part of the contract
  • Full asbestos clearance before any structural work begins
  • Soft strip-out: ceilings, floors, partitions, plumbing, electrics
  • Full structural demolition of outbuildings, garages and extensions
  • Concrete base removal and complete site clearance
  • Waste management — asbestos to licensed facilities, other materials recycled
  • Single-contract service — no multiple contractors needed

Why Choose Us

From Survey to Cleared Site — One Contract

Survey to Clearance in One Contract

Pre-demolition survey, asbestos removal, and demolition under one contract. Single point of responsibility, one programme of works, one sign-off.

HSE-Licensed for Complex Materials

If demolition reveals high-risk licensed materials, our HSE licence means we can proceed without a third-party contractor — no delays or additional cost.

Full Soft Strip Capability

Our teams carry out full soft strip-outs ahead of structural demolition — removing ceilings, flooring, partitions, plumbing and electrical fittings.

Site Clearance Included

On completion, all arising materials are cleared. Asbestos waste goes to licensed facilities; other demolition materials are recycled where possible.

Common Questions

Frequently Asked Questions

Does asbestos legally have to be removed before demolition?
Yes. The Control of Asbestos Regulations 2012 require a refurbishment and demolition survey before demolition starts, and all identified ACMs must be removed first. Proceeding without this is a criminal offence and puts lives at risk.
What is a soft strip-out?
The removal of all non-structural building elements — ceilings, floors, partition walls, plumbing, electrical fittings and fixtures — leaving only the structural shell. Required before structural demolition, major refurbishment, or building conversion.
Can you demolish a garage or outbuilding?
Yes. We carry out full demolition of garages, sheds, outbuildings and extensions — including pre-demolition survey, asbestos removal, demolition, and site clearance as a single package.

One Contract, Clean Site

Get a Demolition & Strip-Out Quote

We handle everything from pre-demolition survey to final site clearance across Surrey, London and the Home Counties. Contact us for a fast quotation.